Inspection Supply Chain Training CEO

Experience

GARDNER DENVER PZ-11 / PZL Mud Pump Liner 200PZL456 201PZL456 301PZL4055 > Mud Pump Liner > Mud Pump Spare Parts

Production Process: The bi-metal cylinder Liner of our company combined with the advantages of abrasion hot-forging out liner and anticorrosion high chrome inner liner. The out liner is made of high quality carbon steel by hot pressing forming. Its tensile strength is over 900000psi. The inner liner is made of high-chromium alloy by centrifugal casting.

High Quality Mud Pump Parts, Different Size Liner, Ceramic Liner
Mud Pump Liners

Description

General features:

Ceramic Liners combine the strength of a forged steel outer shell with the abrasion and corrosion resistance of a ceramic inner sleeve. Ceramic cylinder inner sleeve is used zirconia toughening alumina ceramics obtained the national patent, using zirconium oxide the characteristics of high fracture toughness and high hardness of alumina, the combination of these two can improve the fatigue strength of the product. Its coat uses 45 steel forging with good mechanical properties. After tempering heat treatment, hardness of HB235-265, the tensile strength is not less than 655 mpa.

Mud Pump Parts Model We Can Do

1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

More customer view:89-SOUTHWEST 12-P-160 PUMP-yindapump.com.pdf

GARDNER DENVER PZ-11 / PZL Mud Pump Liner 200PZL456 201PZL456 301PZL4055 > Mud Pump Liner > Mud Pump Spare Parts

Request for Offer