Inspection Supply Chain Training CEO

IWCF Well Intervention Snubbing Level 2

IWCF Well Intervention Snubbing Level 2

Course Outline

  • Application SN When snubbing is used
  • Equipment SN The snubbing equipment in different operating environments
  • Surface PCE Stack SN PCE required for snubbing operations
  • Primary Barrier Elements SN Primary barrier elements used during snubbing operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) SN Secondary barrier elements (snubbing BOPs) used during snubbing operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) SN BOP ram configurations for different snubbing operations
  • Shearing Devices SN Snubbing shearing devices
  • PRESSURE CONTROL (BARRIER ELEMENTS and ENVELOPES) PRINCIPLES SN Grouping barrier elements into barrier envelopes during snubbing operations
  • Safely repair or replace failed primary barrier element SN The reasons for changing worn elastomers and temporary suspension of Work
  • Safely repair or replace failed primary barrier element SN Secondary barrier elements and envelopes for snubbing if a primary barrier element fails
  • Safely repair or replace failed primary barrier element SN Maintaining a double barrier when changing the annular element during intervention
  • Operational Considerations (with well control consequences) SN The forces on the workstring created by well pressure
  • Operational Considerations (with well control consequences) SN Snubbing pipe in and out of a live well (with square collars/ram to ram)
  • Controlled Well Shut in SN How to shut in the well quickly and safely with or without work-string in the hole.
  • Snubbing Shear Ram Equipment Operating Limit Explain how running different types of tool string through the shearing device can affect its shearing capability

Refund policy

You can cancel your booking and refund your fees before course start date by 48 hrs.