ceo-photo Ceo training-photo Training inspection-photo Inspection Supply Chain-photo Supply Chain

IWCF Well Intervention Wireline Level 3 & 4

IWCF Well Intervention Wireline Level 3 & 4

Course Outline

  • Application WL When wireline is used and the different types Available
  • Equipment WL Wireline equipment in different operating Environments
  • Surface PCE Stack WL CE required for wireline operations
  • Primary Barrier Elements WL Primary barrier elements used during wireline operations
  • Primary Barrier Elements WL Slickline primary barrier sealing elements and how to operate them correctly
  • Primary Barrier Elements WL Braided line/electric line primary barrier sealing elements and how to operate them correctly
  • Primary Barrier Elements WL Primary barrier element integrity during wireline operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) WL Secondary barrier elements (wireline BOPs) used during wireline operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) WL BOP ram configurations for different types of wireline
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) WL How to operate secondary barrier elements (slickline BOPs)
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) WL How to operate secondary barrier elements (braided line/electric line BOPs)
  • Shearing Devices WL Wireline shearing devices
  • PRESSURE CONTROL (BARRIER ELEMENTS and ENVELOPES) PRINCIPLES WL Grouping barrier elements into barrier envelopes during wireline operations
  • Other operations - PCE Stack WL The PCE rig-up during wireline fishing operations
  • Safely repair or replace a failed primary barrier element WL Secondary barrier elements and envelopes for slickline operations if a primary barrier element fails
  • Safely repair or replace a failed primary barrier element WL Secondary barrier elements and envelopes for braided line/electric line operations if a primary barrier element fails
  • PCE Rig Up WL The equipment required for a safe and compatible wireline PCE rig-up
  • PCE Testing WL The specific requirements for pressure testing/function testing PCE including wireline BOPs, shear/seal BOPs and valves
  • PCE Testing WL Testing the BOP with test rods
  • Operational Considerations (with well control consequences) WL The reason for wireline drift runs
  • Operational Considerations (with well control consequences) WL Surface Controlled Sub Surface Safety Valve (SCSSSV) integrity during a wireline operation
  • Operational Considerations (with well control consequences) WL Use and limitations of wireline cutter bars
  • Controlled Well Shut in WL Tool string positioning across the wireline BOP
  • Operational Considerations (with well control consequences) WL Force created by well pressure, flow and conditions compared to tool string/cable weight
  • Controlled Well Shut in WL Tool string positioning across the wireline BOP
  • Controlled Well Shut in WL Operating a wireline BOP
  • Controlled Well Shut in WL How to shut in the well quickly and safely with or without wireline in the hole
  • Loss of Pressure Control During Well Intervention Operations WL What to do if there are defects that could affect BOP function during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if there is a failure in one component of the PCE during a slickline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if there is a failure in one component of the PCE during a braided line/electric line operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if the wire is damaged during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if there is a hydraulic control line leak on the Xmas Tree hydraulic master valve during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if the hydraulic control line of the Surface Controlled Sub Surface Safety Valve (SCSSSV) leaks during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if the BOP hydraulic control unit or hoses fail during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if the wire breaks and falls downhole during a wireline operation
  • Loss of Pressure Control During Well Intervention Operations WL What to do if an alarm sounds when wireline is in the well and you are required to muster in a safe area

Refund policy

You can cancel your booking and refund your fees before course start date by 48 hrs.

Download Attachment

Courses Price Schedule Branch Dates Course Details Reservation
IWCF Well Intervention Wireline Level 3 & 4 850 USD Sunday Online From : 2024-10-13
To : 2024-10-17
More Inforamtion Reservation
Share