Top

IWCF Well Intervention Coiled Tubing Level 2

Course Outline

  • Application CT When coiled tubing is used
  • Equipment CT The coiled tubing equipment in different operating environments
  • PRESSURE CONTROL Surface PCE Stack CT PCE required for coiled tubing operations
  • PRESSURE CONTROL Primary Barrier Elements CT Primary barrier elements (strippers) used during coiled tubing operations
  • PRESSURE CONTROL Secondary Barrier Elements – BOPs (Ram Type Preventers) CT. Secondary barrier elements (coiled tubing BOPs) used during coiled tubing operations
  • PRESSURE CONTROL Secondary Barrier Elements – BOPs (Ram Type Preventers) CT BOP ram configurations for different coiled tubing operations
  • PRESSURE CONTROL Shearing Devices CT Coiled tubing shearing devices
  • PRESSURE CONTROL Other Well Control Devices CT Downhole check valves(back pressure valves) in a Bottom Hole Assembly (BHA) during coiled tubing operations
  • PRESSURE CONTROL (BARRIER ELEMENTS and ENVELOPES) PRINCIPLES CT Grouping barrier elements into barrier envelopes during coiled tubing operations
  •  Safely repair or replace a failed primary barrier element CT Maintaining a double barrier when changing a coiled tubing stripper rubber during intervention operations
  • Safely repair or replace a failed primary barrier element CT Secondary barrier elements and envelopes for coiled tubing operations if a primary barrier element fails
  • Operational Considerations (with well control consequences) CT The forces on coiled tubing created by well pressure
  • Controlled Well Shut in CT Coiled tubing shear ram equipment operating limits
  • Controlled Well Shut in CT How to shut in the well quickly and safely with or without coiled tubing in the hole

Download Attachment

Sorry , there is no schedules (content or dates or details ) for this course.

Share