ceo-photo Ceo training-photo Training inspection-photo Inspection Supply Chain-photo Supply Chain

IWCF Well Intervention Snubbing Level 3 & 4

IWCF Well Intervention Snubbing Level 3 & 4

Course Outline

  • Application SN When snubbing is used
  • Equipment SN The snubbing equipment in different operating environments
  • PRESSURE CONTROL Surface PCE Stack SN PCE required for snubbing operations
  • Primary Barrier Elements SN Primary barrier elements used during snubbing
  • Primary Barrier Elements SN Snubbing primary barrier sealing elements and how to operate them correctly
  • Primary Barrier Elements SN Primary barrier element integrity during snubbing operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) SN Secondary barrier elements (snubbing BOPs) used during snubbing operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) SN BOP ram configurations for different snubbing operations
  • Secondary Barrier Elements – BOPs (Ram Type Preventers) SN How to operate secondary barrier elements (snubbing BOPs) including annular BOPs and pipe ram/safety BOPs
  • Shearing Devices SN Snubbing shearing devices
  • Other Well Control Devices SN Downhole check valves (back pressure valves) used during snubbing operations
  • Other Well Control Devices SN The need for and the use of alternative and additional internal well control devices in snubbing operations
  • PRESSURE CONTROL (BARRIER ELEMENTS AND ENVELOPES) PRINCIPLES SN Grouping barrier elements into barrier envelopes during snubbing operations
  • Other Operations - PCE Stack SN A snubbing pressurised deployment system
  • Other Operations - PCE Stack SN Changes to ram equipment for different pipe sizes including tapered string
  • Safely repair or replace failed primary barrier element SN The reasons for changing worn elastomers
  • Safely repair or replace failed primary barrier element SN Secondary barrier elements and envelopes for snubbing if a primary barrier element fails
  • Safely repair or replace failed primary barrier element SN Maintaining a double barrier when changing the annular element during intervention
  • PCE Rig Up SN The equipment required for a safe and compatible snubbing PCE rig-up
  • PCE Testing SN PCE pressure tests and function tests with the workstring in place
  • Operational Considerations (with well control consequences) SN The forces on the workstring created by well pressure
  • Operational Considerations (with well control consequences) SN Snubbing pipe in and out of a live well (with square collars/ram to ram)
  • Controlled Well Shut in SN How to shut in the well quickly and safely with or without work-string in the hole
  • Controlled Well Shut in SN Snubbing shear ram equipment operating limits
  • Loss of Pressure Control During Well Intervention Operations SN How to identify defects that could affect BOP function during a snubbing operation
  • Loss of Pressure Control During Well Intervention Operations SN What to do if surface equipment fails while the work string is in the well during a snubbing operation
  • Loss of Pressure Control During Well Intervention Operations SN What to do if the slip bowl fails during a snubbing operation
  • Loss of Pressure Control During Well Intervention Operations SN What to do if there is a leak from the surface equipment to the atmosphere during a snubbing operation
  • Loss of Pressure Control During Well Intervention Operations SN What to do if pressure is seen at surface inside the work string during a snubbing operation
  • Loss of Pressure Control During Well Intervention Operations SN What to do if an alarm sounds when the workstring is in the well and you are required to muster in a safe area
  • Loss of Pressure Control During Well Intervention Operations SN What to do if the workstring down hole check valves (back pressure valves) leak while in the hole during a snubbing operation

Refund policy

You can cancel your booking and refund your fees before course start date by 48 hrs.

Download Attachment

Courses Price Schedule Branch Dates Course Details Reservation
IWCF Well Intervention Snubbing Level 3 & 4 850 USD Sunday Online From : 2024-10-13
To : 2024-10-17
More Inforamtion Reservation
Share