IWCF Well Intervention Snubbing Level 3 & 4
Course Outline
- Application SN When snubbing is used
- Equipment SN The snubbing equipment in different operating environments
- PRESSURE CONTROL Surface PCE Stack SN PCE required for snubbing operations
- Primary Barrier Elements SN Primary barrier elements used during snubbing
- Primary Barrier Elements SN Snubbing primary barrier sealing elements and how to operate them correctly
- Primary Barrier Elements SN Primary barrier element integrity during snubbing operations
- Secondary Barrier Elements – BOPs (Ram Type Preventers) SN Secondary barrier elements (snubbing BOPs) used during snubbing operations
- Secondary Barrier Elements – BOPs (Ram Type Preventers) SN BOP ram configurations for different snubbing operations
- Secondary Barrier Elements – BOPs (Ram Type Preventers) SN How to operate secondary barrier elements (snubbing BOPs) including annular BOPs and pipe ram/safety BOPs
- Shearing Devices SN Snubbing shearing devices
- Other Well Control Devices SN Downhole check valves (back pressure valves) used during snubbing operations
- Other Well Control Devices SN The need for and the use of alternative and additional internal well control devices in snubbing operations
- PRESSURE CONTROL (BARRIER ELEMENTS AND ENVELOPES) PRINCIPLES SN Grouping barrier elements into barrier envelopes during snubbing operations
- Other Operations - PCE Stack SN A snubbing pressurised deployment system
- Other Operations - PCE Stack SN Changes to ram equipment for different pipe sizes including tapered string
- Safely repair or replace failed primary barrier element SN The reasons for changing worn elastomers
- Safely repair or replace failed primary barrier element SN Secondary barrier elements and envelopes for snubbing if a primary barrier element fails
- Safely repair or replace failed primary barrier element SN Maintaining a double barrier when changing the annular element during intervention
- PCE Rig Up SN The equipment required for a safe and compatible snubbing PCE rig-up
- PCE Testing SN PCE pressure tests and function tests with the workstring in place
- Operational Considerations (with well control consequences) SN The forces on the workstring created by well pressure
- Operational Considerations (with well control consequences) SN Snubbing pipe in and out of a live well (with square collars/ram to ram)
- Controlled Well Shut in SN How to shut in the well quickly and safely with or without work-string in the hole
- Controlled Well Shut in SN Snubbing shear ram equipment operating limits
- Loss of Pressure Control During Well Intervention Operations SN How to identify defects that could affect BOP function during a snubbing operation
- Loss of Pressure Control During Well Intervention Operations SN What to do if surface equipment fails while the work string is in the well during a snubbing operation
- Loss of Pressure Control During Well Intervention Operations SN What to do if the slip bowl fails during a snubbing operation
- Loss of Pressure Control During Well Intervention Operations SN What to do if there is a leak from the surface equipment to the atmosphere during a snubbing operation
- Loss of Pressure Control During Well Intervention Operations SN What to do if pressure is seen at surface inside the work string during a snubbing operation
- Loss of Pressure Control During Well Intervention Operations SN What to do if an alarm sounds when the workstring is in the well and you are required to muster in a safe area
- Loss of Pressure Control During Well Intervention Operations SN What to do if the workstring down hole check valves (back pressure valves) leak while in the hole during a snubbing operation
Refund policy
You can cancel your booking and refund your fees before course start date by 48 hrs.