Inspection Past Experience For February 2025
Job Number |
Job Date |
Company |
RIG |
Location |
Description |
Details |
330 |
10/2/2025 |
SinoTharwa |
4 |
Ras Gharib - GPC |
Lifting |
Lifting |
333 |
10/2/2025 |
SinoTharwa |
4 |
Ras Gharib - GPC |
Tubular |
HWDP |
332 |
12/2/2025 |
SinoTharwa |
2 |
EFCO-MACHINE SHOP - Repair |
Tubular |
HWDP-DC-DP |
300 |
17/2/2025 |
South Dabaa |
PIPE YARD |
South Dabaa Pipe Yard |
TUBING |
TUBING |
335 |
18/2/2025 |
South Dabaa |
HT-105 |
SD 7-4 3X |
TUBING |
TUBING |
334 |
24/2/2025 |
SinoTharwa |
4 |
Ras Gharib - GPC |
LIFTING - LOAD TEST |
LIFTING - LOAD TEST |
331 |
26/2/2025 |
SinoTharwa |
21 |
MDD - Rig 21 |
Air Rattling |
Air Rattling |
346 |
28/2/2025 |
STC |
Badr |
BADR YARD |
DP - Shearwave |
DP - Shearwave |
|
|
|
|
|
|
|
|