ISPR NO Job Ticket Date Company RIG Location Description Job time
From To
191 14/4/2024 SinoTharwa 24 ST-24 Test & Calibration ( OMEGA ) 2024-06-04 2024-08-04
195 14/4/2024 SinoTharwa 9 RAS GHAREB BAKR 162 Lifting - MPI 30/3/2024 2024-04-04
196 2024-03-04 ECDC 2 Ash El Mlaha-Hurghada MPI 29/3/2024 30/3/2024
197 2024-01-04 SinoTharwa 9 GPC- BAKR 162 Tubular 23/3/2024 31/3/2024
198 2024-03-04 SinoTharwa 10 KARAMA MPI 31/3/2024 31/3/2024
199 18/4/2024 SinoTharwa 12 KARAMA - EAS-E1 MPI - WT 2024-02-04 2024-06-04
200 2024-03-04 SinoTharwa 9&12 BADR YARD MPI 2024-02-04 2024-02-04
201 14/4/2024 SinoTharwa 12 ST-12 Test & Calibration ( OMEGA ) 2024-03-04 2024-06-04
202 21/4/2024 SinoTharwa 4 GPC - GHARIB 272 Tubular 13/4/2024 17/4/2024
203 18/4/2024 SinoTharwa 5 ST-5 DROP SURVEY 2024-07-04 2024-08-04
204 18/4/2024 SinoTharwa 5 PETROSHAHD - SHAHD-38 Tubular 15/4/2024 18/4/2024
205 21/4/2024 SinoTharwa 4 RAS GHAREB . GPC Lifting - MPI ( SJ ) 13/4/2024 13/4/2024
206 21/4/2024 SinoTharwa 5 PETROSHAHD Load Test Insp 2024-11-04 2024-11-04
207 21/4/2024 SinoTharwa 8 PETROSHAHD  SE-59 Load Test Insp 2024-12-04 2024-12-04
208 21/4/2024 ECDC 6 AL ALAMIN  BEA-20 Tubular 16/4/2024 18/4/2024
209 14/4/2024 ECDC 2 ECDC-2 Test & Calibration ( OMEGA ) 2024-09-04 2024-10-04
210 23/4/2024 SinoTharwa 8 PETROSHAHD LIFTING - MPI 15/4/2024 20/4/2024
211 25/4/2024 SinoTharwa 8 PETROSHAHD  SHAHD  SE-60 MPI 20/4/2024 22/4/2024
212 25/4/2024 SinoTharwa Base SINOTHARWA MAADI Test & Calibration ( OMEGA ) 20/4/2024 20/4/2024
213 27/4/2024 SinoTharwa 9 GHAREB-GPC-BAKR A62 MPI 24/4/2024 25/4/2024
214 27/4/2024 SinoTharwa 12 EFCO-MACHINE SHOP - Repair Tubular 25/4/2024 25/4/2024
215 27/4/2024 SinoTharwa 24 HURGHADA Lifting - MPI 26/4/2024 27/4/2024