IADC DIT / Stuck Pipe Prevention, Hole cleaning and Fishing Tools
مخطط الكورس
- DAY 1
- What is a “Stuck-Pipe”?
- Mechanisms
- Differential sticking.
- Inadequate hole cleaning.
- Chemically active formation.
- Mechanical Stability.
- Overpressured Formations.
- High Dip Sloughing.
- Unconsolidated Formations.
- Mobile formations.
- Under gauge hole.
- Key Seating.
- Practical Simulator training
- GENERAL STUCK PIPE PREVENTION
- Stuck Pipe is Not Inevitable
- Bottom Hole Assemblies
- Drilling
- Tripping
- Casing and Cementing .
- Practical Simulator training
- DAY 2
- STUCK PIPE WARNING SIGNS
- Erratic torque
- the smooth torque increase sign of
- the maximum pull can be exert on string
- The Definition of pipe is sticking
- The definition of hole pack off Monitor hole condition from analyzing cuttings
- Drilling out shoe and cleaning up
- avoid junk in the hole
- How do we find out that the hole is under gauge ?
- Practical Simulator training
- WELLBORE STABILITY / HOLE PACK OFF
- Unconsolidated Formation
- Mobile Formations
- Fractured/faulted Formations
- Geopressured Formations
- Reactive Formations
- Practical Simulator training
- DIFFERENTIAL STICKING
- Good Practices to Avoid Diff. Sticking
- Mud Properties and Treatments
- OTHER CAUSES OF STUCK PIPE
- Key seating
- Undergauge Hole
- Wellbore Geometry
- Junk
- Green Cement
- Cement Blocks
- Collapsed Casing
- STUCK PIPE WARNING SIGNS
- DAY 3
- FREEING STUCK PIPE
- Freeing Stuck Pipe Flowchart
- Stuck Pipe Freeing Table
- Optimum Fishing Time
- Mechanical Freeing
- Overpull Calculations
- Jarring Calculations
- Packed Off Hole
- Differential Sticking Decision Tree
- U-tubing
- Spotting Fluids
- Freshwater Pills
- Inhibited HCI Pills
- Back-off Shots
- Practical Simulator training
- FREEING STUCK PIPE
Refund policy
You can cancel your booking and refund your fees before course start date by 48 hrs.