ceo-photo Ceo training-photo Training inspection-photo Inspection Supply Chain-photo Supply Chain

Experience

Inspection Past Experience For December 2024

Job Number Job Date Company RIG Location Description Details
306 8/12/2024 SinoTharwa 9 GPC - BAKR-163 LIFTING LOAD TEST
311 10/12/2024 SinoTharwa 4 G.P.C MPI-WALL THICKNESS-LOAD TEST MPI-WALL THICKNESS-LOAD TEST
307 12/12/2024 SinoTharwa 2 EFCO-MACHINE SHOP - Repair Tubular SUBS
310 12/12/2024 THO   FUTURE WORKSHOP SHEARWAVE SHEARWAVE
295 13/12/2024 South Dabaa EDC RIG 63 SWA 10-1 X TUBING TUBING
312 16/12/2024 SinoTharwa 2 EFCO-MACHINE SHOP - Repair Tubular DP
313 16/12/2024 SinoTharwa 12 EFCO-MACHINE SHOP - Repair Tubular DP-HWDP
314 18/12/2024 SinoTharwa 9 G.P.C MPI MPI
315 20/12/2024 SinoTharwa 2 NORPETCO TUBULAR-SHEARWAVE SHEARWAVE - HWDP-SUBS-DC
296 20/12/2024 South Dabaa Ghareb SWA 1-1 X TUBING TUBING
317 26/12/2024 SinoTharwa 2 EFCO-MACHINE SHOP - Repair TUBULAR SUBS-HWDP
323 26/12/2024 Shelf Drilling 141 Zait Bay & Zaafarana LIFTING-MPI-ROPE ACCESS LIFTING-MPI-ROPE ACCESS
318 29/12/2024 ECDC 1 PICO-WORK SHOP - Repair TUBULAR SUBS
319 29/12/2024 ECDC 10 PICO-WORK SHOP - Repair TUBULAR DC
320 31/12/2024 SinoTharwa 12 East Sanan ( Alamin ) TUBULAR DP-HWDP