IWCF Well Intervention Coiled Tubing Level 2
مخطط الكورس
- Application CT When coiled tubing is used
- Equipment CT The coiled tubing equipment in different operating environments
- PRESSURE CONTROL Surface PCE Stack CT PCE required for coiled tubing operations
- PRESSURE CONTROL Primary Barrier Elements CT Primary barrier elements (strippers) used during coiled tubing operations
- PRESSURE CONTROL Secondary Barrier Elements – BOPs (Ram Type Preventers) CT. Secondary barrier elements (coiled tubing BOPs) used during coiled tubing operations
- PRESSURE CONTROL Secondary Barrier Elements – BOPs (Ram Type Preventers) CT BOP ram configurations for different coiled tubing operations
- PRESSURE CONTROL Shearing Devices CT Coiled tubing shearing devices
- PRESSURE CONTROL Other Well Control Devices CT Downhole check valves(back pressure valves) in a Bottom Hole Assembly (BHA) during coiled tubing operations
- PRESSURE CONTROL (BARRIER ELEMENTS and ENVELOPES) PRINCIPLES CT Grouping barrier elements into barrier envelopes during coiled tubing operations
- Safely repair or replace a failed primary barrier element CT Maintaining a double barrier when changing a coiled tubing stripper rubber during intervention operations
- Safely repair or replace a failed primary barrier element CT Secondary barrier elements and envelopes for coiled tubing operations if a primary barrier element fails
- Operational Considerations (with well control consequences) CT The forces on coiled tubing created by well pressure
- Controlled Well Shut in CT Coiled tubing shear ram equipment operating limits
- Controlled Well Shut in CT How to shut in the well quickly and safely with or without coiled tubing in the hole
Refund policy
You can cancel your booking and refund your fees before course start date by 48 hrs.