ceo-photo Ceo training-photo Training inspection-photo Inspection Supply Chain-photo Supply Chain

Experience

Inspection Past Experience For January 2024

Job Ticket Date Company RIG Location Description Job time
From To
1/1/2024 SinoTharwa 21 ST-21 Pipe Cleaning Jet Pump 27/12/2023 2/1/2024
1/1/2024 SinoTharwa 21 PETRO SANNAN-ST  21  AES  E61/1 Tubular 21/12/2023 27/12/2023
2/1/2024 SinoTharwa 26 PETROBEL- 113A39 Tubular 29/12/2023 1/1/2024
3/1/2024 ECDC 810 BADR 3 Tubular 27/12/2023 28/12/2023
3/1/2024 ECDC 815 BADR 3 Tubular 29/12/2023 1/1/2024
7/1/2024 NPSCO 4 Abo Redis PETROBEL UT ( SHARE WAVE ) 5/1/2024 5/1/2024
7/1/2024 SinoTharwa 12 EAS F-3 Lifting 29/12/2023 4/1/2024
10/1/2024 NPSCO 1 & 4 Abo Redis ARM-6 Tubular-MPI    
10/1/2024 NPSCO 4 PETROBEL DROP SURVEY 8/1/2024 9/1/2024
10/1/2024 NPSCO 4 PETROBEL Test & Calibration ( OMEGA ) 8/1/2024 8/1/2024
10/1/2024 SinoTharwa 29 ST-29 Test & Calibration ( OMEGA ) 1/1/2024 9/1/2024
14/1/2024 SinoTharwa 12 KARAMA-EAS E1 Tubular 9/1/2024 11/1/2024
14/1/2024 SinoTharwa 26 ABU RESIS - 113-A39 Tubular-MPI 5/1/2024 11/1/2024
15/1/2024 SinoTharwa 26 ST-26 Test & Calibration ( OMEGA ) 7/1/2024 12/1/2024