ceo-photo Ceo training-photo Training inspection-photo Inspection Supply Chain-photo Supply Chain

Experience

Inspection Past Experience For May 2025

Job Number Job Date Company RIG Location Description Details
355 3/5/2025 NORPETCO EDC RIG 11 South Abrar 49 Casing Casing
356 3/5/2025 NORPETCO N/A NORPETCO YARD Tubing Tubing
357 4/5/2025 NORPETCO N/A NORPETCO YARD Tubing Tubing
388 5/5/2025 SinoTharwa 7 Ras Gharib - GPC TUBULAR - MPI DP-DC-HW-SUBS-MPI
386 6/5/2025 SinoTharwa 2 NORPETCO LIFTING-MPI LIFTING-MPI
358 6/5/2025 NORPETCO N/A NORPETCO YARD Tubing Tubing
359 8/5/2025 NORPETCO N/A NORPETCO YARD Tubing Tubing
360 9/5/2025 NORPETCO EDC RIG 11 South Abrar 49 Casing Casing
343 10/5/2025 South Dabaa HT-105 SD-3-18 TUBING TUBING
389 10/5/2025 SinoTharwa 2 NORPETCO LOAD TEST LOAD TEST
390 12/5/2025 SinoTharwa 7 RAS GHARIB TUBULAR - MPI DP-HWDP-SUBS-MPI
362 15/5/2025 NORPETCO N/A NORPETCO YARD Tubing Tubing
361 19/5/2025 NORPETCO EDC RIG 11 South Abrar 49 Casing Casing
344 20/5/2025 South Dabaa HT-105 D-3-35 TUBING TUBING
363 24/5/2025 NORPETCO EDC RIG 11 South Abrar 49 Casing Casing
387 25/5/2025 NPSCO 2&4&5 Abo Redis MPI-Wall Thickness MPI-Wall Thickness