Inspection Supply Chain Training CEO

Experience

Inspection Past Experience For August 2024

ISPR NO Job Ticket Date Company RIG Location Description Details Job time
From To
249 7/8/2024 SinoTharwa 9 ST-9 DROP OBJECT SURVEY DROP OBJECT SURVEY 20/7/2024 22/7/2024
244 4/8/2024 South Dabaa HT-105 SD 3-53 TUBING TUBING 14/7/2024 18/7/2024
251 19/8/2024 SinoTharwa Base SINOTHARWA MAADI Test & Calibration ( Measuresoft )   18/8/2024 18/8/2024
252 4/8/2024 South Dabaa CRANE GZ 7-3 TUBING TUBING 24/7/2024 28/7/2024
253 4/8/2024 South Dabaa CRANE SD 1-11 TUBING TUBING 28/7/2024 31/7/2024
254 12/8/2024 South Dabaa HT-105 SD 3-1 TUBING TUBING 3/8/2024 5/8/2024