Inspection Supply Chain Training CEO

Experience

Inspection Past Experience For July 2024

ISPR NO Job Ticket Date Company RIG Location Description Details Job time
From To
237 22/7/2024 SinoTharwa 4 G.P.C - GHARIB 274 Lifting - MPI Lifting - MPI 4/7/2024 13/7/2024
242 17/7/2024 SinoTharwa 24 ST-24 Test & Calibration ( OMEGA )   5/7/2024 7/7/2024
243 21/7/2024 South Dabaa HT-105 HITECH-Rig-105 TUBING TUBING 1/7/2024 13/7/2024
245 18/7/2024 SinoTharwa 2 ST-2 DROP OBJECT SURVEY DROP OBJECT SURVEY 9/7/2024 11/7/2024
246 15/7/2024 SinoTharwa 9 ST-9 DROP OBJECT SURVEY DROP OBJECT SURVEY 20/3/2024 22/3/2024
247 21/7/2024 SinoTharwa 9 G.P.C WT WT 14/7/2024 16/7/2024
248 21/7/2024 SinoTharwa 4 G.P.C - GHARIB 274 Tubular DP-DC-HW-SUBS-WT-MPI 4/7/2024 12/7/2024
250 17/7/2024 SinoTharwa Base SINOTHARWA MAADI Test & Calibration ( OMEGA ) Maintenance 17/7/2024 17/7/2024
237 22/7/2024 SinoTharwa 4 G.P.C - GHARIB 274 Lifting - MPI Lifting - MPI 4/7/2024 13/7/2024
242 17/7/2024 SinoTharwa 24 ST-24 Test & Calibration ( OMEGA )   5/7/2024 7/7/2024
243 21/7/2024 South Dabaa HT-105 HITECH-Rig-105 TUBING TUBING 1/7/2024 13/7/2024