Top

Stuck Pipe Prevention, Hole cleaning and Fishing Tools

Course Outline

  • Day 1
    • 1. What is a “Stuck-Pipe”
    • 2. Mechanisms

                          - 2.1. Differential sticking.

                          - 2.2. Inadequate hole cleaning.

                          - 2.3. Chemically active formation.

                          - 2.4. Mechanical Stability.

                          - 2.5. Overpressured Formations

                          - 2.6. High Dip Sloughing.

                          - 2.7. Unconsolidated Formations

                          - 2.8. Mobile formations.

                          - 2.9. Under gauge hole.

                          - 2.10. Key Seating.

                          - 2.11. Practical Simulator training

 

    • 3. GENERAL STUCK PIPE PREVENTION

                           - 3.1 Stuck Pipe is Not Inevitable

                           - 3.2 Bottom Hole Assemblies

                           - 3.3 Drilling

                           - 3.4 Tripping

                           - 3.5 Casing and Cementing

                           - 3.6 Practical Simulator training

  • Day 2
    • 4. STUCK PIPE WARNING SIGNS

                          - 4.1 Erratic torque

                          - 4.2 the smooth torque increase sign of

                          - 4.3 the maximum pull can be exert on string

                          - 4.4 The Definition of pipe is sticking

                          - 4.5 The definition of hole pack off

                          - 4.6 Monitor hole condition from analyzing cuttings

                          - 4.7 Drilling out shoe and cleaning up

                          - 4.8 avoid junk in the hole

                          - 4.9 How do we find out that the hole is under gauge ?

                          - 4.10 Practical Simulator training

    • 5. WELLBORE STABILITY / HOLE PACK OFF​​​​​​​​​​​​​​

                          - 5.1 Unconsolidated Formation

                          - 5.2 Mobile Formations

                          - 5.3 Fractured/faulted Formations

                          - 5.4 Geopressured Formations

                          - 5.5 Reactive Formations

                          - 2.6 Practical Simulator training

    • 6. DIFFERENTIAL STICKING​​​​​​​

                          - 6.1 Good Practices to Avoid Diff. Sticking

                          - 6.2 Mud Properties and Treatments

    • 7. OTHER CAUSES OF STUCK PIPE​​​​​​​

                          - 7.1 Key seating

                          - 7.2 Undergauge Hole

                          - 7.3 Wellbore Geometry

                          - 7.4 Junk

                          - 7.5 Green Cement

                          - 7.6 Cement Blocks

                          - 7.7 Collapsed Casing

  • Day 3
    • 8. FREEING STUCK PIPE

                          - 8.1 Freeing Stuck Pipe Flowchart

                          - 8.2 Stuck Pipe Freeing Table

                          - 8.3 Optimum Fishing Time

                          - 8.4 Mechanical Freeing

                          - 8.5 Overpull Calculations

                          - 8.6 Jarring Calculations

                          - 8.7 Packed Off Hole

                          - 8.8 Differential Sticking Decision Tree

                          - 8.9 U-tubing

                          - 8.10 Spotting Fluids

                          - 8.11 Freshwater Pills

                          - 8.12 Inhibited HCI Pills

                          - 8.13 Back-off Shots

                          - 8.14 Practical Simulator training

                       

Download Attachment

Sorry , there is no schedules (content or dates or details ) for this course.

Share